PREMIER Design + Build completes Dania Beach FL industrial spec facility

0
465
bridge port marina mile

PREMIER Design + Build Group, based in Itasca, IL was selected by Bridge Development Partners, LLC to lead construction of Bridge Point Marina Mile in Dania Beach, Florida Construction of the 189,620 sq. ft. Class A industrial spec facility was recently finished and is now available to prospective tenants.

Tenants at the state-of-the art project on a 16.5 acre parcel, at 3400 SW 30th Ave. will benefit from its proximity to Fort Lauderdale-Hollywood International Airport and Port Everglades. Tenants can also select from a local labor pool from towns throughout Broward County.

“Bridge Point Marina Mile meets the demand for new industrial buildings with class A amenities in Southeast Florida,” said PREMIER executive vice-president Brian Paul.

Marina Mile is the second industrial facility completed by PREMIER in the Southeast market. Bridge Point Port 95 was the first, and several other construction projects are currently underway.

bridge port marina mile
Bridge Port Marina Mile

Building envelope materials for Bridge Point Marina Mile include concrete tilt-wall, structural steel and a 45 mil TPO roofing system. Onsite storm water management is handled by exfiltration trenches and both wet and dry retention. The facility features 32’ clear-height warehouse spaces, 26 truck dock positions, an ESFR fire protection sprinkler system and 1600 amp, 277/480 volt electrical service and a parking lot with 238 stalls.

Julie Piszczek of PREMIER Design + Build Group, LLC was the project manager and Ed Lebak was the field superintendent for Marina Mile. David Wigoda and Steve Wasserman of Jones Lang LaSalle represent the building. RLC Architects provided the architectural design and Landplan Engineering provided engineering services;

 

LEAVE A REPLY

Please enter your comment!
Please enter your name here