Chicago Construction News staff writer
Plans are advancing for an education, health and science campus in Chicago’s Washington Park neighbourhood that will include a four-storey clinical laboratory, a new community college campus and a 630-space parking structure.
The University of Chicago, University of Chicago Medicine and City Colleges of Chicago presented the site plan at a community meeting Oct. 6, outlining the proposed buildings, a landscaped plaza and site improvements along Garfield Boulevard between the Garfield Green Line station and Dr. Martin Luther King Jr. Drive.
Construction of the clinical laboratory is scheduled to begin in spring 2027, subject to state and city approvals, with completion targeted for 2029. UChicago Medicine submitted a certificate of need application to the Illinois Health Facilities and Services Review Board last month.
The project was first announced in March 2024 and is intended to combine healthcare training with clinical laboratory operations, creating a pathway for South Side residents to pursue jobs in the healthcare sector.
BOWA Construction, a South Side firm, will serve as construction manager for the laboratory in a joint venture with Leopardo. Power Construction and South Side-based UJAMAA Construction will build the parking structure and carry out site improvements.
Construction of the laboratory, parking structure and site improvements is expected to support about 1,380 jobs.
The laboratory would consolidate UChicago Medicine pathology operations currently housed in separate buildings across its Hyde Park campus. The facility would expand testing capacity, accommodate specialized testing currently performed out of state and provide services to community hospitals across the region.
The building would support about 550 jobs, including approximately 350 positions relocated from Hyde Park and 200 new entry-level jobs.
Plans call for a public food hall on the laboratory’s ground floor at Garfield Boulevard and King Drive. UChicago Medicine would build out the space and lease it to vendors, with local and South Side businesses invited to apply through a competitive request for proposals.
The adjacent Malcolm X College South Campus would also be four storeys and accommodate more than 800 students annually when fully operational. City Colleges of Chicago plans to offer programs including medical laboratory assisting, medical laboratory technology, phlebotomy and community health worker training.
The college expects to submit its application for approval of the building next year. The proposed medical laboratory technician program would be the first of its kind in Chicago, according to the institutions.
Locating the college beside the laboratory would allow students to move between classroom instruction and clinical rotations at UChicago Medicine. The partnership is intended to help address an estimated 500 annual openings for clinical laboratory technicians in the Chicago area.
The site plan places the college at the corner of Calumet Avenue and Garfield Boulevard, away from the Green Line tracks, with a landscaped plaza connecting the two buildings.
A 630-space parking structure would serve the campus and accommodate future development. Plans also include a public transit waiting area near the Garfield Green Line station. The layout is intended to keep traffic within the site and reduce impacts on residential streets to the north. 54th Place would be widened and remain open to the public.
The three institutions have continued refining the plans following community consultation since the project was announced. At the Oct. 6 meeting, residents raised questions about access to training and employment opportunities, outreach to nearby schools and the provision of green space.
The project team will work to meet applicable city hiring and contracting goals through outreach and local hiring fairs.
The Chicago Plan Commission is expected to review the planned development in November, while the state review board is expected to consider the laboratory application in December.
In the coming weeks, a contractor is expected to begin demolishing the former gas station at Garfield Boulevard and King Drive and cleaning up the site.




