Keeley Construction to build Helukabel USA Manufacturing expansion in West Dundee

0
255

Chicago Construction News staff writer

Keeley Construction has announced a partnership with Helukabel USA on a major 132,000-sq. ft.  expansion of its facility located at 1201 Wesman Dr. in West Dundee. The project will introduce new warehouse, office, and climate-controlled manufacturing space—marking the first onsite manufacturing at Helukabel’s existing location.

Construction is currently underway and upgrades include:

  • 9-inch-thick floor slab with an isolated area designed specifically for a twister machine
  • Custom red storefront framing to match Helukabel’s brand identity
  • Two new EV charging stations for office use
  • Expanded office space featuring a gym, cable testing and assembly areas, new locker rooms, showers, and a modern breakroom
  • Design-build mechanical, electrical, and plumbing systems led by Keeley’s MEP trade partners
  • Two new depressed dock positions with retaining walls to streamline logistics and delivery

Keeley Construction’s project team is led by Paul Jennrich, Senior Project Manager; Dan Zboncak, Senior Superintendent; and Dorothy Mateo, Project Coordinator.

Project partners include Skedio Architecture, J&H, and Benchmark Developers, serving as the owner’s representative.

LEAVE A REPLY

Please enter your comment!
Please enter your name here